首页 | 本学科首页   官方微博 | 高级检索  
     

不同采矿方案顶柱围岩三维稳定性分析
引用本文:南世卿.不同采矿方案顶柱围岩三维稳定性分析[J].金属矿山,2009,39(10):32.
作者姓名:南世卿
作者单位:石人沟铁矿
基金项目:"十一五"国家科技支撑计划项目 
摘    要:露天转地下开采矿山地下首采中段安全顶住厚度确定是矿山的关键技术问题,采用MSC.Patran和MSC.Nastran三维可视化计算软件,对不同顶柱厚度采矿方案顶柱围岩稳定性进行了分析。矿山可根据沿走向不同剖面上围岩条件确定不同的顶柱厚度的采矿方案。

关 键 词:采矿方案  顶柱围岩  稳定性分析  三维可视化  

Three-dimensional Stability Analysis on Pillar Wall Rocks for Different Mining Scheme
Nan Shiqing.Three-dimensional Stability Analysis on Pillar Wall Rocks for Different Mining Scheme[J].Metal Mine,2009,39(10):32.
Authors:Nan Shiqing
Affiliation:Shirengou Iron Mine
Abstract:The determination of safe pillar's thickness in the middle section of the first mining for transferring to underground mining from open pit is the key technical issue for mine.With MSC.Patran and MSC.Nastran three-dimensional visualization computing software,the stability of pillar wall rocks by different mining programs with different thickness was analyzed.Mine can determine the mining program with different pillar's thickness based on conditions of top wall rocks for different section along the strike.
Keywords:Mining scheme  Pillar wall rocks  Stability analysis  Three-dimensional visualization
本文献已被 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号