首页 | 本学科首页   官方微博 | 高级检索  
     

?????????·???????????????????????е????
引用本文:???????????Т????????????????η????.?????????·???????????????????????е????[J].天然气工业,2017,37(1):82-89.
作者姓名:???????????Т????????????????η????
作者单位:1.?й?????????﹫???2.?й????????????????
摘    要:


Staged fracturing of horizontal shale gas wells with temporary plugging by sand filling
Liang Xing,Zhu Juhui,Shi Xiaozhi,Zhang Juncheng,Liu Chen,He Feng & Li Ran.Staged fracturing of horizontal shale gas wells with temporary plugging by sand filling[J].Natural Gas Industry,2017,37(1):82-89.
Authors:Liang Xing  Zhu Juhui  Shi Xiaozhi  Zhang Juncheng  Liu Chen  He Feng & Li Ran
Abstract:??Due to downhole complexities, shale-gas horizontal well fracturing in the Sichuan Basin suffered from casing deformation and failure to apply the technique of cable-conveyed perforation bridge plug. In view of these problems, a new technique of staged volume fracturing with temporary plugging by sand filling is employed. Based on theoretical analyses and field tests, a design of optimized parameters of coiled tubing multi-cluster sand-blasting perforation and temporary plugging by sand filling was proposed. It was applied in the horizontal Well ZJ-1 in which casing deformation occurred. The following results are achieved in field operations. First, this technique enables selective staged fracturing in horizontal sections. Second, this technique can realize massive staged fracturing credibly without mechanical plugging, with the operating efficiency equivalent to the conventional bridge plug staged fracturing. Third, full-hole is preserved after fracturing, thus it is possible to directly conduct an open flow test without time consumption of a wiper trip. The staged volume fracturing with temporary plugging by sand filling facilitated the 14-stage fracturing in Well ZJ-1, with similar SRV to that achieved by conventional bridge plug staged fracturing and higher gas yield than neighboring wells at the same platform. Thus, a new and effective technique is presented in multi-cluster staged volume fracturing of shale gas horizontal wells.
Keywords:Multi-cluster sand-blasting perforation  Temporary plugging by sand filling  Staged fracturing  Volume fracturing  Casing deformation  
  Shale gas  Horizontal well  Zhaotong National Shale Gas Demonstration Zone  
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号