水布垭水电站尾水清渣效益分析
引用本文:梁福林,袁兵. 水布垭水电站尾水清渣效益分析[J]. 湖北水力发电, 2009, 0(6): 82-83
作者姓名:梁福林  袁兵
作者单位:中国长江三峡工程开发总公司,湖北,宜昌,443000;湖北清江水电开发有限责任公司,湖北,宜昌,443000
摘    要:水布垭水电站运行初期,尾水河床形成冲坑和堆渣,抬高了尾水位,对发电有不利影响。清渣以后,发电效益明显增加。

关 键 词:水布垭水电站  尾水清渣  发电效益

Dredging result of tailrace channel of Shuibuya Hydropower Plant
LIANG Fulin,YUAN Bing. Dredging result of tailrace channel of Shuibuya Hydropower Plant[J]. Hubei Water Power, 2009, 0(6): 82-83
Authors:LIANG Fulin  YUAN Bing
Affiliation:1. China TGP Corp., Yichang 443000, China; 2. Hubei Qingjiang Hydropower Development Co., Ltd., Yichang 443000, China)
Abstract:In the early days after the Shuibuya Hydropower Plant was put into operation,the tailrace channel was filled up by a lot of debris and the tailrace water was raised,the energy output consequently reduced.After the debris were cleaned away,the energy output increased obviously.
Keywords:Shuibuya Hydropower Plant  tailrace channel dredging  power generation benefits