首页 | 本学科首页   官方微博 | 高级检索  
     

某综合楼框-剪结构加层改造工程的设计与施工
引用本文:刘铮.某综合楼框-剪结构加层改造工程的设计与施工[J].建筑结构,2005,35(12).
作者姓名:刘铮
作者单位:北京市建筑设计研究院,100045
摘    要:青岛市委党校健身会议综合楼需进行加层改造,新加楼层结构柱截面保证了受力要求和施工方便。介绍了后建楼层梁与原剪力墙拉接节点的做法及抗风柱与网架选型的原则与连接方法。原工程的基础不需要加固处理。工程使用情况良好,设计经验可供参考。

关 键 词:改造  拉结  设计构造与施工作法

Design and Construction Measures of Additive Floor and Modification Works of a Frame-shear Wall Structure
Liu Zheng.Design and Construction Measures of Additive Floor and Modification Works of a Frame-shear Wall Structure[J].Building Structure,2005,35(12).
Authors:Liu Zheng
Abstract:The design and construction measures of additive floor structure and modification of the complex building in the communist party school in Qingdao are introduced.The additive column sections can meet the bearing and construction demands.The connection of the beam of additive floor and original shear wall,and the principle of structural column and web frame type choices are introduced.The original foundation work does not need to be strengthened.The design experience can be a reference for similar engineering.
Keywords:rehabilitation  combine tensely  design and construction  measures  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号