考虑区域自治能力的主动配电网分层优化调度
引用本文:孟繁星,孙英云,蒲天骄,陈乃仕,李晨,吴华华.考虑区域自治能力的主动配电网分层优化调度[J].电力系统自动化,2018,42(15):70-76.
作者姓名:孟繁星  孙英云  蒲天骄  陈乃仕  李晨  吴华华
作者单位:华北电力大学电气与电子工程学院;中国电力科学研究院有限公司;国家电网公司国家电力调度控制中心;国网浙江省电力有限公司
基金项目:国家重点研发计划资助项目(2017YFB0903300);国家电网公司科技项目(DZ71-16-039)
摘    要:主动配电网是实现配电网集成新能源的有效技术手段,目前多采用全局优化+区域自治的分层分区的优化调度方法。由于主动配电网中各区域的可控资源并不均衡,某些区域自治能力较低可能导致实时情况下难以自治,从而使得实际运行结果与计划值产生较大偏差,降低了系统总体的运行效率。文中重点研究了区域自治的满足条件以及自治能力的衡量方法,并利用鲁棒机会约束模型将其引入到调度计划中,提出了考虑区域自治能力的主动配电网优化调度模型,引用最优条件分解理论实现模型的分层协调求解。采用浙江某地的实际系统数据作为算例,验证了所提方法的有效性。

关 键 词:分层分区优化调度  区域自治能力  鲁棒机会约束  最优条件分解  二阶锥松弛
收稿时间:2017/9/17 0:00:00
修稿时间:2018/7/3 0:00:00

Hierarchical Optimal Scheduling Model for Active Distribution Network Considering Regional Autonomy Ability
MENG Fanxing,SUN Yingyun,PU Tianjiao,CHEN Naishi,LI Chen and WU Huahua.Hierarchical Optimal Scheduling Model for Active Distribution Network Considering Regional Autonomy Ability[J].Automation of Electric Power Systems,2018,42(15):70-76.
Authors:MENG Fanxing  SUN Yingyun  PU Tianjiao  CHEN Naishi  LI Chen and WU Huahua
Affiliation:School of Electrical & Electronic Engineering, North China Electric Power University, Beijing 102206, China,School of Electrical & Electronic Engineering, North China Electric Power University, Beijing 102206, China,China Electric Power Research Institute, Beijing 100192, China,China Electric Power Research Institute, Beijing 100192, China,National Electric Power Dispatching and Control Center, State Grid Corporation of China, Beijing 100031, China and State Grid Zhejiang Electric Power Co. Ltd., Hangzhou 310007, China
Abstract:Active distribution network is an effective technology to realize the integration of new energy into distribution network. Nowadays, the hierarchical partition optimal scheduling strategy based on regional autonomy and global optimization is adopted. Due to the unbalance of controllable resources in the active distribution network, the low regional autonomy ability may lead to the difficulty of autonomous management in real time, which makes the actual operation result deviate the planned value greatly and reduces the overall operation effectiveness of the system. Therefore, this paper mainly focuses on the satisfaction conditions of regional autonomy and the evaluation method of autonomy ability. Then, the robust chance constraint model is used to introduce the regional autonomy into the scheduling plan, and an optimal scheduling model of active distribution network considering regional autonomy is proposed. And later, to solve the model hierarchically, optimality condition decomposition methods are adopted. Lastly, the effectiveness of the proposed method is verified by the simulation analysis of an actual system in Zhejiang Province.
Keywords:hierarchical partition optimal scheduling  regional autonomy ability  robust chance constraint  optimality condition decomposition  second-order cone relaxation