首页 | 本学科首页   官方微博 | 高级检索  
     

端锚CFRP-混凝土界面剥离全过程解析模型
引用本文:董坤,荆范华,郝爱江,李鹏,郝建文.端锚CFRP-混凝土界面剥离全过程解析模型[J].哈尔滨工业大学学报,2021,53(4):71-79.
作者姓名:董坤  荆范华  郝爱江  李鹏  郝建文
作者单位:中国海洋大学 工程学院,山东 青岛,266100;滨州市公路勘察设计院,山东 滨州,256600;山东大学 土建与水利学院,济南250000
基金项目:国家自然科学基金(52008384);中国博士后科学基金(2019M652477);青岛市博士后研究人员应用研究项目(861905042002)
摘    要:端部锚固是一种控制CFRP-混凝土黏结界面剥离和提高界面承载力的有效措施。为研究端部锚固下CFRP-混凝土黏结界面的剥离过程,引入指数型界面黏结-滑移本构,推导了黏结界面剥离全过程的解析模型,得到了黏结界面滑移、黏结应力、CFRP应变和应力分布表达式,上述解析模型得到了试验结果的良好验证。基于解析模型,给出了黏结界面的最大黏结力、有效黏结长度和剥离荷载的计算方法,并分析了不同黏结长度对界面剥离全过程受力行为的影响。分析表明:相比纯外贴黏结界面,端部锚固黏结界面的有效黏结长度有所增加,且剥离荷载随黏结长度的增加而降低,并趋近于纯外贴黏结界面的极限承载力;当黏结长度较长时,其剥离荷载与最大黏结力相差不大,此时端部锚固力很小;当黏结长度较短时,端部锚固会更早地参与承担荷载,其剥离荷载接近CFRP拉断荷载。

关 键 词:混凝土结构  CFRP加固  端部锚固  解析模型  剥离行为
收稿时间:2020/8/23 0:00:00

Analytical models of the whole debonding process of CFRP-to-concrete interface with end anchorage
DONG Kun,JING Fanhu,HAO Aijiang,LI Peng,HAO Jianwen.Analytical models of the whole debonding process of CFRP-to-concrete interface with end anchorage[J].Journal of Harbin Institute of Technology,2021,53(4):71-79.
Authors:DONG Kun  JING Fanhu  HAO Aijiang  LI Peng  HAO Jianwen
Affiliation:College of Engineering, Ocean University of China, Qingdao 266100, Shandong, China;Binzhou City Highway Survey and Design Institute, Binzhou 256600, Shandong, China; School of Civil Engineering, Shandong University, Jinan 250000, China
Abstract:End anchorage is an effective measure to control the debonding of CFRP-to-concrete bond interface and improve the interface bearing capacity. To study the debonding process of CFRP-to-concrete interface with end anchorage, the exponential bond-slip model was introduced to establish analytical models. The distribution expressions of interfacial slip, bond stress, CFRP axial strain and stress were obtained. The proposed models were well verified by experimental results. Based on the analytical models, the calculation methods of the maximum bond force, effective bond length, and debonding load were established, and the influence of different bond lengths on the mechanical behaviors of the interface during the debonding process was analyzed. Results show that the effective bond length of the bonded interface with end anchorage was longer than that of the external bonded interface. The debonding load decreased with the increase of the bond length, approaching the ultimate bearing capacity of the external bonded interface. When the bond length was long, there was little difference between the debonding load and the maximum bond force, and the end anchoring force was small. When the bond length was short, the end anchorage would bear the load earlier, and the debonding load was close to the CFRP breaking load.
Keywords:concrete structure  CFRP strengthening  end anchorage  analytical model  debonding behavior
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《哈尔滨工业大学学报》浏览原始摘要信息
点击此处可从《哈尔滨工业大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号