首页 | 本学科首页   官方微博 | 高级检索  
     


Availability for 2/n: F and secondary subsystems with general repair-time distributions and shut-off rules
Authors:Yow-Mow Chen  T Fujisawa
Abstract:The model which main 2/n: F and secondary subsystems subject to shut-off rules is considered. In this model, the system has single repair facility. The repair discipline that the main subsystem has the preemptive repeat priority is considered. Constant failure rate and general repair-time distribution are assumed. The system availability is obtained by using linear ordinary differential equation method and supplymentary variable technique.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号