首页 | 本学科首页   官方微博 | 高级检索  
     

N-J水电站岩爆区卸压技术的能量耗散率分析
引用本文:陈方明,谷江洪,朱斌,王鲁瑀.N-J水电站岩爆区卸压技术的能量耗散率分析[J].山东大学学报(工学版),2017,47(2):26-31.
作者姓名:陈方明  谷江洪  朱斌  王鲁瑀
作者单位:1.中国葛洲坝集团第三工程公司, 陕西 西安 710000;2.中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室, 湖北 武汉 430071
摘    要:为研究岩爆区卸压技术的能量耗散率,对巴基斯坦N-J水电站引水隧洞TBM施工的岩爆区进行钻孔卸压和爆破卸压分析,主要对108 mm直径钻孔的卸压应力释放、预裂爆破等情况进行数值模拟,模拟钻孔间距分别为0.5、1.0、1.5、2.0、2.5 m时的孔内钻孔卸压和预裂爆破情况。分析结果表明:预裂爆破卸压法的能量耗散率最高可达到27%,而单纯的钻孔卸压法的能量耗散率最大仅为5.9%,因此预裂爆破卸压的卸压效果远好于单纯的钻孔卸压方法的卸压效果;对于预裂爆破法来说,能量耗散率随卸压孔间距的增加而增大,基本呈指数型增长趋势,对于单纯的钻孔卸压法来说,能量耗散率随卸压孔间距的增加而减小,因此在生产现场应根据不同卸压方法布置合理的钻孔间距。

关 键 词:预裂爆破  钻孔卸压  能量耗散率  岩爆  N-J水电站  
收稿时间:2017-02-14

Energy dissipating rate analysis of N-J hydropower station by pressure relief technique
CHEN Fangming,GU Jianghong,ZHU Bin,WANG Luyu.Energy dissipating rate analysis of N-J hydropower station by pressure relief technique[J].Journal of Shandong University of Technology,2017,47(2):26-31.
Authors:CHEN Fangming  GU Jianghong  ZHU Bin  WANG Luyu
Affiliation:1. No. 3 Engineering Co., Ltd., China Gezhouba Group, Xi'an 710000, Shaanxi, China;2. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071, Hubei, China
Abstract:In order to study energy dissipating rate of stress relief technique, the drill core pressure relief and blasting analysis of rock burst area of TBM diversion tunnel in Pakistan N-J Hydropower Station were carried out. Borehole pressure relief and pre-spliting blasting of 108 mm diameter drill core were simulated. The borehole pressure relief and pre-spliting blasting was simulated in spacing of 0.5, 1.0, 1.5, 2.0 and 2.5 m. The numerical simulation results showed that the stress relief in TBM tunnel could reduce stress concentration phenomenon. The effect of pre-spliting blasting was much better than drill core pressure relief. Energy dissipation rate of pre-splitting blasting pressure relief reached 27%, while the energy dissipation rate of the simple borehole pressure relief method was only 5.9%. Pre-spliting blasting pressure relief method should be used to reduce the pressure in the rock burst area in project site. In the condition of pre-splitting blasting, the relationship between energy dissipation rate and spacing is basically exponential growth trend. For drill core pressure relief, the relationship between energy dissipation rate and spacing is positive correlation. It is important that layout of drill spacing should be reasonable planning.
Keywords:rock burst  pre-spliting blasting  energy dissipating rate  N-J hydropower station  borehole pressure relief  
本文献已被 CNKI 等数据库收录!
点击此处可从《山东大学学报(工学版)》浏览原始摘要信息
点击此处可从《山东大学学报(工学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号