汕头华能电厂电缆隧道盾构工作井沉井施工
引用本文:张耀三. 汕头华能电厂电缆隧道盾构工作井沉井施工[J]. 中国市政工程, 2008, 0(2): 62-64
作者姓名:张耀三
作者单位:上海隧道工程股份有限公司,上海,200082
摘    要:汕头华能电厂二期工程过海电缆隧道盾构工作井沉井施工处于流塑状淤泥质土中,为保证沉井在接高、下沉过程中稳定、顺利,采取了在沉井内部区域打设砂桩、在沉井外部进行高压深层旋喷桩围护技术措施,取得了良好的效果。还介绍了沉井施工方案和施工技术及监测。

关 键 词:电缆隧道  盾构工作井  沉井施工
文章编号:1004-4655(2008)02-0062-03
修稿时间:2008-02-04

Caisson Construction for Shield Machine Working Shaft for A Cable Tunnel to Shantou Huaneng Power Plant
Abstract:In the project of Shantou Huaneng Power Plant (II), caisson construction for the working shaft of the segmental sea crossing cable tunnel is carried out through the flowing plastic mucky soil. To ensure steady and smooth operation during connection and sinking of the caisson, engineering measures are taken to provide sand piles inside the caisson and deep high pressure rotary jet pile fencing outside, and have a good result. Introduced hereby are the proposed method and the technique and monitor adopted in caisson construction.
Keywords:cable tunnel  shield machine working shaft  caisson construction