对 “抢险不跑坝,漫滩不死人 ”的思考
引用本文:廖义伟. 对 “抢险不跑坝,漫滩不死人 ”的思考[J]. 人民黄河, 2004, 26(1): 3-4
作者姓名:廖义伟
作者单位:黄河水利委员会,河南,郑州,450003
摘    要:根据黄河防总提出的“抢险不跑坝,漫滩不死人”的防汛要求,在防汛抢险方面,提出了适当降低当前河道控导工程的防守标准,适当增加河道控导工程的防汛备料、调整料物的结构,调整抢险力量结构,有针对性地修订抢险预案及加强抢险队伍的安全保障等建议;提出了优化水库调度,实施两个“二级分化”的调度方法;在工程建设与加固方面,提出了加高加固标准不足的工程,继续安排根石加固和加快重点河段综合治理进度等建议;在滩区安全和政策方面,提出了国家对黄河滩区总体上要实行“主动减灾、积极避水、政策扶持”的方针和继续积极稳妥地破除滩区生产堤等建议。

关 键 词:防汛抢险 水库调度 工程加固 滩区建设 黄河
文章编号:1000-1379(2004)01-0003-02
修稿时间:2003-12-05

Pondering Over "Groins should be Stable in Rush Repairs and No Death in Flooding"
LIAO Yi-wei. Pondering Over "Groins should be Stable in Rush Repairs and No Death in Flooding"[J]. Yellow River, 2004, 26(1): 3-4
Authors:LIAO Yi-wei
Abstract:According to the requirements of "Groins should be Stable in Rush Repairs and No Death in Flooding" put forward for flood control by General Headquarters of Flood Control of the Yellow River, on the aspect of flood control and rush repairs, the paper puts forward the suggestions of properly reducing the prevention standard for constraint works, properly increasing the reserved materials for constraint works, readjusting the structure of goods and materials, readjusting the structure of rush repair teams, revising rush repair plans in the light of some particular conditions and strengthening the security of safety of rush repair teams. It also puts forward to optimize reservoir regulation and carry out the method of two "Polarity". On the aspect of engineering construction and consolidation, it puts forward the suggestions on reinforcing the engineering works those have not yet reached the standards, continuously reinforcing the foundation rock and quickening the speed of integrated management of key river sections. On the aspect of safety and policy of floodplains, it puts forward the suggestions that the State should put into effect the policy of "initiative hazards reduction, positively avoiding floods and policy support" in the Yellow River floodplain area and continuously demolishing production dykes on the floodplain in a positive and reliable way.
Keywords:suggestion   flood control and rush repair   reservoir regulation   reinforcement of engineering works   floodplain building   the Yellow River