首页 | 本学科首页   官方微博 | 高级检索  
     

飞来峡电厂1~#主变保护装置技术改造
引用本文:吴珏.飞来峡电厂1~#主变保护装置技术改造[J].广东水利水电,2015(4).
作者姓名:吴珏
作者单位:广东省飞来峡水利枢纽管理处,广东清远,511825
摘    要:飞来峡电厂1#主变压器保护装置因超期服役、双重化配置要求和省网安评考核需要等原因进行技术改造。该文介绍了本次技改方案的内容,重点阐述方案对新增保护装置选型、配置的技术要求和具体实施过程,点明本次技术改造起到设备更新换代、提高安全系数和满足新形势需要的效果。

关 键 词:飞来峡电厂  1#主变  保护装置  技术改造

Feilaixia Power Plant 1 # Main Transformer Protection Device Technical Reformation
WU Jue.Feilaixia Power Plant 1 # Main Transformer Protection Device Technical Reformation[J].Guangdong Water Resources and Hydropower,2015(4).
Authors:WU Jue
Affiliation:Feilaixia power plant 1 # main transformer protection device for overterm service, double configuration requirements, and the province may be a review of the assessment need to wait for a reason technical renovation. The technical scheme and the content of the emphasis on solutions for new protection device selection and configuration of technical requirements and specific implementation process have been introduced. The technical transformation equipment upgrading, safety coefficient improvement and the needs of new situation have been pointed out as well.
Abstract:Feilaixia power plant; 1 # main transformer; protection device; technical transformation
Keywords:Feilaixia power plant  1# main transformer  protection device  technical transformation
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《广东水利水电》浏览原始摘要信息
点击此处可从《广东水利水电》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号