苏通大桥新旧混凝土界面监测分析
引用本文:谷伟铭 陈志坚. 苏通大桥新旧混凝土界面监测分析[J]. 低温建筑技术, 2014, 0(1): 106-108
作者姓名:谷伟铭 陈志坚
作者单位:河海大学地球科学与工程学院,南京210098
摘    要:苏通大桥8号主墩承台第三层混凝土在浇筑时,由于施工人员的失误,错将粉煤灰当做混凝土浇筑。文通过对重新浇筑的混凝土在浇筑期和浇筑后19次的监测及数据处理,分析新旧混凝土结合面黏结状况。

关 键 词:新旧混凝土  黏结  结合面  监测

ANALYSIS OF MONITORING ABOUT NEW-TO-OLD CONCRETE INTERFACE IN SUTONG BRIDGE
GU Wei-ming,CHEN Zhi-jian. ANALYSIS OF MONITORING ABOUT NEW-TO-OLD CONCRETE INTERFACE IN SUTONG BRIDGE[J]. Low Temperature Architecture Technology, 2014, 0(1): 106-108
Authors:GU Wei-ming  CHEN Zhi-jian
Affiliation:(College of Earth Sciences and Engineering, Hohai University, Nanjing 210098, China)
Abstract:Due to the mistakes of the construction workers, during casting the third layer concrete of bearing platform of main pier 8 in Sutong Bridge, the fly ash is mistaken as the concrete. This paper ana- lyses the bonding conditions of joint surface about new-to-old concrete through the date of 19-times moni- toting during the concrete pouring and after pouting.
Keywords:new-to-old concrete  bonging  joint surface  monitoring