首页 | 本学科首页   官方微博 | 高级检索  
     

后张法箱梁预制施工工艺及张拉过程控制
引用本文:王万远.后张法箱梁预制施工工艺及张拉过程控制[J].山西建筑,2008,34(29).
作者姓名:王万远
作者单位:江苏东南交通工程咨询监理有限公司,江苏,南京,214226
摘    要:介绍了后张法箱梁预制施工工艺特点及适用范围,对后张法箱梁预应力张拉施工的过程控制进行了分析,并提出了相关观点,对施工过程做了详细阐述,实践证明该工艺已经成功应用于公路桥梁、市政桥梁建设上.

关 键 词:后张法箱梁  施工工艺  预应力张拉  过程控制

Post-tensioning method box beam prefabricating construction technology and tension process control
WANG Wan-yuan.Post-tensioning method box beam prefabricating construction technology and tension process control[J].Shanxi Architecture,2008,34(29).
Authors:WANG Wan-yuan
Affiliation:WANG Wan-yuan
Abstract:It introduces the post-tensioning method box beam prefabricating construction technology and applying field,analyses the process control of post-tensioning method box beam pre-stress tension construction,puts forward the related views,and represents the construction process.And practice illustrates that the technology had be used in road bridge and public bridge construction successfully.
Keywords:post-tensioning method box beam  construction technology  pre-stress tension  process control  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号