首页 | 本学科首页   官方微博 | 高级检索  
     

峻山水库主坝泄洪消能防冲水工整体模型试验
引用本文:杜念. 峻山水库主坝泄洪消能防冲水工整体模型试验[J]. 广西水利水电, 2013, 0(6): 6-9,16
作者姓名:杜念
作者单位:广西水利科学研究院,广西南宁530023
摘    要:针对峻山水库主坝下游左岸突出山体带来的下游消能问题,通过多方案的比较试验研究,论证溢流坝平面布置的合理性,推荐适合工程实际的消能方案,该方案较好地解决了溢流坝下游消能防冲问题。工程以推荐方案为依据进行设计施工,目前已通过竣工验收投入使用。

关 键 词:溢流坝  消能  防冲  水工模型  试验  峻山水库

Integral hydraulic model test of main dam energy dissipation and scour prevention structure for Junshan Reservoir
DU Nian. Integral hydraulic model test of main dam energy dissipation and scour prevention structure for Junshan Reservoir[J]. Gx Water Resources & Hydropower Engineering, 2013, 0(6): 6-9,16
Authors:DU Nian
Affiliation:DU Nian (Guangxi Hydraulic Research Institute, Nanning 530023, China)
Abstract:Protruding mountain body on the left bank downstream of main dam of Junshan Reservoir leads to energy dissipation problem. By comparative tests and study of multiple alternatives, the rationality of overflow dam layout plan was demonstrated, and a energy dissipation scheme suited to the actual conditions of the project was recom- mended, as a good solution for overflow dam energy dissipation and scour prevention. The project had been de- signed and constructed according to the recommended scheme, and had been put into operation after completion acceptance.
Keywords:Overflow dam  energy dissipation  scour prevention  hydraulic model  test  Junshan Reservoir
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号