首页 | 本学科首页   官方微博 | 高级检索  
     

西山分矿下向构筑工艺研究与应用
引用本文:吴杨,刘再涛,王栋毅,彭康.西山分矿下向构筑工艺研究与应用[J].矿冶工程,2021,41(5):14-17.
作者姓名:吴杨  刘再涛  王栋毅  彭康
作者单位:重庆大学 资源与安全学院,重庆400044;山东黄金矿业有限公司三山岛金矿,山东 莱州261442;中南大学 资源与安全工程学院,湖南 长沙410083
基金项目:国家自然科学基金(51974043,51774058); 重庆市科技计划项目基础科学与前沿技术研究专项(cstc2018jcyjA3320)
摘    要:针对三山岛金矿西山分矿某破碎矿段矿体难开采、原有上向水平进路充填法支护工程量大、作业循环周期长等问题,拟采用下向进路(进路宽3.6 m、高3.0 m)充填采矿法回采该段破碎矿体。通过安全系数法计算出承载层所需C30混凝土或尾砂胶结体厚度,对下向构筑工艺及施工步骤进行了介绍,并在试验采场进行了现场应用。结果表明,下向进路充填采矿法不但减轻了支护成本和支护工作量,同时保障了破碎矿体回采过程中的施工安全性,为破碎矿体安全高效开采积累了宝贵经验。

关 键 词:下向充填采矿法  破碎矿体  人工假顶  现场应用
收稿时间:2021-04-08

Research and Application of Downward Construction Technology in Xishan Branch Mine
WU Yang,LIU Zai-tao,WANG Dong-yi,PENG Kang.Research and Application of Downward Construction Technology in Xishan Branch Mine[J].Mining and Metallurgical Engineering,2021,41(5):14-17.
Authors:WU Yang  LIU Zai-tao  WANG Dong-yi  PENG Kang
Affiliation:1.School of Resources and Safety Engineering, Chongqing University, Chongqing 400044, China; 2.Sanshandao Gold Mine of Shandong Gold Mining Co Ltd, Laizhou 261442, Shandong, China; 3.School of Resources and Safety Engineering, Central South University, Changsha 410083, Hunan, China
Abstract:In view of the problems in Xishan Branch of Sanshandao Gold Mine, including difficult mining of the broken orebody, a large amount of supporting work required and the long operation cycles in the previous overhand cut-and-fill mining method, it is proposed to adopt a underhand cut-and-fill mining (with an access road 3.6 m wide and 3.0 m high) to stope those broken orebody. The thickness of C30 concrete or tailings cement required for the bearing layer was calculated with the safety factor method and the downward operation techniques and the steps were introduced in detail. Based on the practical application of this method in the tested stope, it is shown that this underhand cut-and-fill mining method can not only reduce the cost and workload of the support, but also guarantee the operation safety in the process of mining broken orebodies, which can accumulate some valuable experience for the safe and efficient mining of broken ore bodies.
Keywords:underhand cut-and-fill mining method  broken ore body  artificial false roof  field application  
本文献已被 万方数据 等数据库收录!
点击此处可从《矿冶工程》浏览原始摘要信息
点击此处可从《矿冶工程》下载全文