中天广场主楼爬模,飞模体系的设计和施工
引用本文:卢建.中天广场主楼爬模,飞模体系的设计和施工[J].建筑技术,1997,28(10):694-696.
作者姓名:卢建
作者单位:广州市第二建筑工程有限公司!高级工程师,510045,广州
摘    要:中天广场标准层外梁,外柱和核心筒墙体采用爬模,标准层楼面采用飞模,梁主模板用螺栓拉结,爬模设备为电动提升机,钢模板通过螺栓悬吊于顶上的支载架上,合模时移动模到预定位置,拆模时的松动合膜螺栓,即可移动模板,飞模以梁边界分为成各个飞模单元,飞模由桁架,面板,钢支腿组成,飞模备2套,周转使用。

关 键 词:爬模  飞模  钢模  模板工程  高层建筑  综合广场

DESIGN AND CONSTRUCTION OF THE CLIMBING FORM AND DECK FORM FOR CON-STRUCTION OF THE ZHONG-TAIN SQUARE PROJECT MAIN BUILDING
Lu Jian.DESIGN AND CONSTRUCTION OF THE CLIMBING FORM AND DECK FORM FOR CON-STRUCTION OF THE ZHONG-TAIN SQUARE PROJECT MAIN BUILDING[J].Architecture Technology,1997,28(10):694-696.
Authors:Lu Jian
Abstract:The construction of the Zhong-tain Square Project's standard storey's exterior beams,and exterior columns and core walls have been done by climbing form work.Beam's and column's forms are connected and tied by bolts.Column form's equipments are operated by lifters. Steel forms are bolted and hung on tops of supports.Before form's operation,they are prefixed at their proper positions. While during form's removal,they are stripped off and removed away by turning of bolts.Deck forms are divided along their respective beam-edges,and seperated into various units.Deck forms are prepared of two complete sets and operated on shifts.
Keywords:climbing form  deck form  steel form  core structure  standard storey