南京状元楼预应力转换层结构工程研究 |
| |
引用本文: | 吕志涛 刘平昌. 南京状元楼预应力转换层结构工程研究[J]. 建筑技术, 1997, 28(3): 178-180 |
| |
作者姓名: | 吕志涛 刘平昌 |
| |
作者单位: | 南京市建筑设计研究院!高级工程师,210005,南京 |
| |
摘 要: | 南京状元楼酒店扩建工程为实现上下柱网的改变,利用设备层作为结构转换层,通过多种结构方案的模拟试验,确定在转换层结构上分阶段施加预应力,取得了改善结构受力性能,减少挠度和梁截面高度,节约钢材,提高梁抗裂性能的效果。
|
关 键 词: | 高层建筑 转换层结构 预应力 设计 |
A STUDY ON THE TRANSFER OF UP AND DOWN STOREYS BY PRESTRESSEDSTRUCTURE OF THE NANJING ZHUANGYUANLOU PROJECT |
| |
Abstract: | The extension work of the Nanjing Zhuangyuanlou has been well completed on the transfer of up and down storeys by prestress structure. The transformation of up and down storeys' column systems has been realized by making use of its equipment and facilities storey as its transfer storey. The prestress method has been firstly tested by a series of practical experiments and secondly carried out well on seperate stages. Thus, it has eventually improved its loading physical property, saved lots of steel and promoted anti-crackability. |
| |
Keywords: | highrise building girder of transfer storey prestressed concrete |
本文献已被 维普 等数据库收录! |