首页 | 本学科首页   官方微博 | 高级检索  
     

电力市场中梯级水电站组合交易策略研究
引用本文:朱承军,周建中. 电力市场中梯级水电站组合交易策略研究[J]. 华东电力, 2006, 34(7): 10-14
作者姓名:朱承军  周建中
作者单位:华中科技大学,水电与数字化工程学院,湖北,武汉,4300742;中国长江三峡工程开发总公司,湖北,宜昌,443002;华中科技大学,水电与数字化工程学院,湖北,武汉,4300742
基金项目:国家自然科学基金 , 教育部高等学校博士学科点专项科研基金
摘    要:电力市场中梯级水电站担负着系统调峰、备用等功能,由于梯级水电站受到丰水、枯水季节变化,自身发电效率降低,进而影响其在市场中的交易.针对梯级水电站自身入库径流随机性,汛期需要兼顾防洪、发电、航运等等不确定因素以及市场中的电价波动等等特点,提出把梯级水电站交易方式按照时间先后尺度分为上下两层,每层采用序贯决策中的Markov决策,把梯级水电站的在电力市场中的交易过程描述为多时间尺度的Markov动态决策,以构建梯级水电站在市场中交易的序贯决策模型.根据系统负荷需求与梯级自身发电容量限制,采用随机动态规划算法优化各层的交易决策变量、梯级各电站出力过程,以实现梯级水电站期望收益最大目标.实例表明该方法具有很好的实用价值.

关 键 词:电力市场  交易策略  序贯决策  多时间尺度Markov决策过程  梯级水电站  实时电价
文章编号:1001-9529(2006)07-0010-05
修稿时间:2006-06-02

Combined transaction strategies for cascade hydropower stations in power markets
ZHU Cheng-jun,ZHOU Jian-zhong. Combined transaction strategies for cascade hydropower stations in power markets[J]. East China Electric Power, 2006, 34(7): 10-14
Authors:ZHU Cheng-jun  ZHOU Jian-zhong
Abstract:The cascade hydropower station bear the tasks of peak regulation and reserve supply in power systems,and its power generation efficiency varies greatly in high and low water periods,which affects its power transactions in the power market.Since the water flow into its reservoir is stochastic,and the uncertainty factors of flood control,power generation,and navigation should be synthetically considered during its flood period,and the electricity price keeps fluctuating in the power market,it is proposed that its power transaction method be classified into 2 levels by time scale,and the Markov of sequential decision-making be adopted for each level.The transaction process can be then described as dynamic multi-time Markov decision-making to build the sequential decision-making model for power transaction of cascade hydropower stations in the power market.Based on the system load demand and the power output of the cascade hydropower stations,the stochastic dynamic programming is adopted to optimize the transaction strategy variables of each level and the power output process of the cascade hydropower stations in order to realize the expected maximum profits.The application case shows that the method is pragmatic.
Keywords:power market  transaction strategy  sequential decision-making  multi-time scaled Markov decision-making process  cascade hydropower station  real-time electricity price
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号