建筑工程项目造价预结算审核中的要点研究
引用本文:侯玲.建筑工程项目造价预结算审核中的要点研究[J].城市建筑,2013(24):185-186.
作者姓名:侯玲
作者单位:中国对外建设海南有限公司,成都610041
摘    要:随着改革开放的深入开展以及市场经济确立,我国经济有了突飞猛进发展。如何开展建筑工程预结算审核,使有限的资金投入充分发挥效益呢?本文详细论述了建筑工程项目造价预结算审核中的要点研究。

关 键 词:建筑工程  工程项目造价  预结算审核

The Key Point Research of the Pre-audit Settlement in the Construction Project Cost
Hou Ling.The Key Point Research of the Pre-audit Settlement in the Construction Project Cost[J].Urbanism and Architecture,2013(24):185-186.
Authors:Hou Ling
Abstract:With the in-depth development of reform and op-ening up as wel as the establishment of market economy, Ch-inese economy has developed by leaps and bounds. How to ca-rry out the project pre-audit set lement to make limited invest-ment benefits into ful play? This article discusses the main po-int research of pre-audit set lement in the construction project cost.
Keywords:construction engineering  construction project co-st  pre-audit set lement