区外来电对高受电比例受端电网辅助服务的影响
引用本文:汪惟源,赵楠,张剑楠,朱寰,王蓓蓓,窦飞,牛文娟.区外来电对高受电比例受端电网辅助服务的影响[J].中国电力,2018,51(11):67-73.
作者姓名:汪惟源  赵楠  张剑楠  朱寰  王蓓蓓  窦飞  牛文娟
作者单位:1. 国网江苏省电力有限公司, 江苏 南京 210008;2. 东南大学 电气工程学院, 江苏 南京 210096;3. 国网江苏省电力有限公司经济技术研究院, 江苏 南京 210008
基金项目:江苏省电力公司科技项目(SGTYHT/16-JS-198)。
摘    要:近年来,特高压工程大量建成投运,使得受端电网受电比例大幅增长。为了保证大电网运行的可靠性和调峰性,辅助服务在高受电比例的受端电网显得尤为重要。针对受端电网的辅助服务,分析探讨区外来电特性对受端电网调峰、备用的影响。在优化后调峰需求、备用需求中,将区外来电等效成三段式出力,利用多特性机组组合模型,仿真区外来电对本地机组的影响。经过仿真可以得出,相同来电容量的区外来电,火电对受端电网调峰能力影响较大、备用较小,水电由于其丰水期满发出力对低谷期备用需求影响最大,风电由于其反调峰特性对调峰影响最大,其不确定性和低谷高出力对低谷备用影响很大。

关 键 词:区外来电  受端电网  辅助服务  调峰  备用  
收稿时间:2017-07-12
修稿时间:2018-06-16

The Impact of Outside Electricity on the Ancillary Service of Power Grid with High-Penetration Received Electricity
WANG Weiyuan,ZHAO Nan,ZHANG Jiannan,ZHU Huan,WANG Beibei,DOU Fei,NIU Wenjuan.The Impact of Outside Electricity on the Ancillary Service of Power Grid with High-Penetration Received Electricity[J].Electric Power,2018,51(11):67-73.
Authors:WANG Weiyuan  ZHAO Nan  ZHANG Jiannan  ZHU Huan  WANG Beibei  DOU Fei  NIU Wenjuan
Affiliation:1. State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210008, China;2. School of Electrical Engineering, Southeast University, Nanjing 210096, China;3. State Grid Jiangsu Economic Research Institute, Nanjing 210008, China
Abstract:With a large number of UHV projects being put into operation in recent years, the proportion of received electricity in the receiving-end grid has increased substantially. To improve the stability and reliability of the power grid, the ancillary service is highly important to the receiving-end grid with high-penetration received electricity. Focusing on the ancillary service, this paper discusses the influence of the characteristics of outside electricity on the peak-shaving and standby capacity demand. Based on the optimized peak-shaving and standby demand, the outside electricity is equivalent to three-segment output power, and a multi-generation combined model is used to simulate the impacts of the outside electricity on local generation sources. The simulation results show that the outside thermal power has a relatively small impacts on peak-shaving and standby demand, and the hydropower has the biggest impacts on the standby demand in valley load time because of its full-capacity generation during flood season,while the outside wind power has the biggest impacts on peak-shaving duo to its reversed peak-shaving features and very high impacts on the standby demand in valley load time due to its uncertainty and high output in valley load period.
Keywords:outside electricity  receiving-end grid  ancillary service  peak shaving  standby demand  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文