适应特高压电网运行的江苏源网荷毫秒级精准切负荷系统深化建设
引用本文:钱君霞,罗建裕,江叶峰,罗凯明,姜太荣,李亚平,刘林,张华成,施慧娟. 适应特高压电网运行的江苏源网荷毫秒级精准切负荷系统深化建设[J]. 中国电力, 2018, 51(11): 104-109. DOI: 10.11930/j.issn.1004-9649.201801082
作者姓名:钱君霞  罗建裕  江叶峰  罗凯明  姜太荣  李亚平  刘林  张华成  施慧娟
作者单位:1. 江苏科能电力工程咨询有限公司, 江苏 南京 210036;2. 国网江苏省电力有限公司, 江苏 南京 210024;3. 中国电力科学研究院有限公司南京分院, 江苏 南京 210003
摘    要:通过对2019年年底华东特高压网架特征和华东电网频率控制必要性的分析,计算得出江苏电网可切负荷容量需求。根据江苏电网负荷特点,结合江苏电网已投运的全国首套源网荷友好互动系统建设运行情况,提出深化建设方案。将电厂不影响机组发电出力的辅机负荷纳入源网荷精准控制范围,提出一种适应大规模、多类型负控终端毫秒级响应的分层分区通信架构,通过技术方案比较将系统总体架构优化为控制中心站、控制主站、控制子站及控制终端4个层次。深化建设方案对于电网进一步推广和加强建设源网荷毫秒级精准切负荷具有借鉴意义。

关 键 词:源网荷  毫秒级  深化建设  精准切负荷  发电机组  
收稿时间:2018-01-15
修稿时间:2018-08-29

Deepening Construction of Jiangsu Source-Network-Load Millisecond-level Precise Load Control System Suitable for UHV Power Grid Operation
QIAN Junxia,LUO Jianyu,JIANG Yefeng,LUO Kaiming,JIANG Tairong,Li Yaping,LIU Lin,ZHANG Huacheng,SHI Huijuan. Deepening Construction of Jiangsu Source-Network-Load Millisecond-level Precise Load Control System Suitable for UHV Power Grid Operation[J]. Electric Power, 2018, 51(11): 104-109. DOI: 10.11930/j.issn.1004-9649.201801082
Authors:QIAN Junxia  LUO Jianyu  JIANG Yefeng  LUO Kaiming  JIANG Tairong  Li Yaping  LIU Lin  ZHANG Huacheng  SHI Huijuan
Affiliation:1. Jiangsu Keneng Electric Power Engineering Consulting Co., Ltd., Nanjing 210036, China;2. State Grid Jiangsu Electric Power Co., Ltd., Nanjing 210024, China;3. China Electric Power Research Institute (Nanjing), Nanjing 210003, China
Abstract:Based on an analysis of the characteristics of Eastern China UHV grid and the necessity of the frequency control of the Eastern China power grid in the end of 2019, the paper calculates the capacity demand for load-shedding of Jiangsu power grid. According to the construction and operation situation of China's first set of source-network-load friendly interactive system, which has been put into operation in Jiangsu Power Grid, a deepening construction plan is proposed. Through inclusion of the load of power plant's auxiliary generator units for the precise control of source-network-load which doesn't affect the power output of the generator units, a hierarchical partition communication structure is established, which is adaptable to the large-scale, multi-type millisecond response. After a comparison of the technical schemes, the system's overall structure is optimized into four levels, including the control center, main control station, control substation and control terminal. The deepening construction plan is of great significance for the state grid to further promote and strengthen the construction of millisecond-level precise load control system of source-network-load.
Keywords:source-network-load  millisecond level  deepening construction  precise load-shedding  generator unit  
本文献已被 CNKI 等数据库收录!
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号