首页 | 本学科首页   官方微博 | 高级检索  
     

万家寨水库调度及其主要矛盾
引用本文:项继承,路新川,任红俊.万家寨水库调度及其主要矛盾[J].电力学报,2006,21(3):382-384,387.
作者姓名:项继承  路新川  任红俊
作者单位:黄河万家寨水利枢纽有限公司,山西,偏关,036412
摘    要:万家寨水库运行以来,取得了显著的经验效益和社会效益,但受水库调度边界条件的制约,影响水库主要功能的充分发挥。本文从水库调度情况出发,浅析万家寨水调与电调矛盾,为以后的工作提出参考意见。

关 键 词:万家寨水库  调度  调峰  不稳定流
文章编号:1005-6548(2006)03-0382-03
收稿时间:2006-06-02
修稿时间:2006-06-022006-06-07

The Dispatch of Wanjiazhai Reservoir and Its Main Contradiction
XIANG Ji-cheng,LU Xin-chuan,REN Hong-jun.The Dispatch of Wanjiazhai Reservoir and Its Main Contradiction[J].Journal of Electric Power,2006,21(3):382-384,387.
Authors:XIANG Ji-cheng  LU Xin-chuan  REN Hong-jun
Affiliation:Yellow River Wanjiazhai Water Control Co. Ltd, Pianguan 036412,China
Abstract:Since Wanjiazhai Reservoir was put into operation,great economic and social effects have been made.But under the boundary condition which restricts the dispatch of the reservoir,the main functions of the reservoir cannot be performed fully.Based on the present situation of hte dispatch of the reservoir,the article analyses the contradictions between water dispatch and electric power dispatch and puts forward some suggestions for reference.
Keywords:Wanjiazhai Reservoir  dispatch  pesk modulation  non-stationary flow
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号