首页 | 本学科首页   官方微博 | 高级检索  
     


A Total Operating Cost Model for Paced Lines with Stochastic Task Times
Authors:John F Kottas  Hon-Shiang Lau
Affiliation:  a University of Missouri - St. Louis, St. Louis, Missouri
Abstract:This paper presents a method for evaluating the often neglected component, the expected incompletion cost, of the operating cost of a paced line with stochastic task times. This incompletion cost is developed through a three stage process. First presented is a procedure for generating all possible combinations of incompleted tasks. Next is an evaluation of the probabilities and costs of their occurrence. Included are not only a mechanism for generating only those incompletion combinations with a significant probability of occurring, but also various techniques for reducing computer storage requirements and computation time. Finally, these make possible an evaluation of the operating cost of paced lines.
Keywords:
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号