大东江大坝GPS一机多天线变形监测试验
引用本文:曹华,叶安洪.大东江大坝GPS一机多天线变形监测试验[J].大坝与安全,2004(6):34-35,38.
作者姓名:曹华  叶安洪
作者单位:东江水电厂,湖南资兴,423403;东江水电厂,湖南资兴,423403
摘    要:为了保证大东江大坝GPS一机多天线自动化监测系统一次建设成功,需要进行前期试验。试验的目的主要针对东江的实际地理环境因素,以及GPS一机多天线的有关问题。

关 键 词:东江大坝  GPS  一机多天线  变形监测  试验
文章编号:1671-1092(2004)06-0034-02

Deformation monitoring test for GPS with multi-antenna in Dongjiang dam
CAO Hua and YE An-hongDongjiang Hydropower Plant.Deformation monitoring test for GPS with multi-antenna in Dongjiang dam[J].Large Dam & Safety,2004(6):34-35,38.
Authors:CAO Hua and YE An-hongDongjiang Hydropower Plant
Affiliation:CAO Hua and YE An-hongDongjiang Hydropower Plant
Abstract:In order to make it possible for the construction of automatic monitoring system through one GPS machine with multi-antenna in Dongjiang dam becoming successful completion, the test should be carried out first. The goal of the test is aiming at the actual geographic and environmental factors, and some problems concerning the one GPS machine with multi-antenna is tested in site.
Keywords:Dongjiang dam  GPS with multi-antenna  deformation monitoring  test  