交流特高压单柱组合耐张塔软跳线施工工艺
引用本文:李君章,郑晓广.交流特高压单柱组合耐张塔软跳线施工工艺[J].电力建设,2010,31(4):32-35.
作者姓名:李君章  郑晓广
作者单位:(河南送变电建设公司,郑州市,450051)
摘    要:1 000 kV淮南-上海输电线路工程采用了单柱组合耐张塔,单柱组合耐张塔2 个单柱塔之间的跳线采用了软跳线。从施工的角度看,需要根据软跳线的设计特点制定合理的施工工艺确保施工质量。结合单柱组合耐张塔软跳线真型试验,对单柱组合耐张塔软跳线施工工艺进行探讨,为1 000 kV 淮南-上海输电线路工程的施工提供参考。

关 键 词:单柱组合耐张塔  软跳线  施工工艺  

Soft Jumper Construction Technology for AC UHV Single-pole Combined Strain Tower
LI Jun-zhang,ZHENG Xiao-guang.Soft Jumper Construction Technology for AC UHV Single-pole Combined Strain Tower[J].Electric Power Construction,2010,31(4):32-35.
Authors:LI Jun-zhang  ZHENG Xiao-guang
Affiliation:(Henan Transmission and Transformation Construction Company,Zhengzhou 450051,China)
Abstract:1 000 kV Huainan—Shanghai transmission line project uses single-pole strain towers,and soft jumpers are adopted between 2 single-pole towers.From a view point of construction the rational construction technology should be worked out according to the jumper design features to ensure construction quality.The paper investigates the jumper construction technology in combination with soft jumper full-scale test of the single-pole combined strain tower,which offers a reference for 1 000 kV Huainan—Shanghai transmission line project construction.
Keywords:single-pole combined strain tower  soft jumper  construction technology