Cross-regional integrated energy system scheduling optimization model considering conditional value at risk
Authors:Xiaobao Yu  Dandan Zheng
Affiliation:School of Economics and Management, Shanghai University of Electric Power, Shanghai, China
Abstract:Integrated energy system is a very important way to improve energy efficiency. Based on the combined heating cooling and power system, combined with energy storage equipment, a cross-regional integrated energy system scheduling optimization problem is studied. An integrated energy system scheduling optimization model is established that meets the requirements of electrical, heating, and cooling load under a variety of energy sources while both considering the interaction of electrical, heating, and cooling load between regions, and complementation of them within one region. Meanwhile, the value at risk (VaR) theory is introduced and the operating constraints of equipment in the integrated energy system fully considered, the integrated energy system scheduling model with VaR is established. The example shows that the model can realize multi-type electrical, heating, and cooling load optimized by schedule across regions under the premise of satisfying the balance of energy supply and demand, which can reduce the system operation cost. The sensitivity analysis of the minimum expected cost and the influencing factors of conditional VaR is carried out to verify the validity and feasibility of the proposed model.
  • An integrated energy system scheduling optimization model is established that meets the requirements of electrical, heating, and cooling load under a variety of energy sources while both considering the interaction of electrical, heating, and cooling load between regions, and complementation of them within one region.
  • By using the conditional value at risk theory to consider various types of the integrated energy system complements and evaluates the operational risk of the system under optimal operating conditions of the system.
  • The total cost of system scheduling operation is proportional to the storage capacity, which is inversely proportional to the heat storage capacity and inversely proportional to the pipeline capacity within a certain interval.
Keywords:CCHP  conditional value at risk  cross-region  integrated energy system  scheduling optimization