首页 | 本学科首页   官方微博 | 高级检索  
     

隔河岩水利枢纽水力学原型观测
引用本文:刘克煌 宁廷俊. 隔河岩水利枢纽水力学原型观测[J]. 水力发电, 1994, 0(1): 24-29
作者姓名:刘克煌 宁廷俊
作者单位:长江科学院
摘    要:1992~1993年对隔河岩工程的原型观测部位包括一、二级消力池、表孔、深孔以及电站引水隧洞和厂房。观测内容有脉动特性、流态、雾化程度和范围、掺气以及空化情况等。观测结果表明,一级消力池是安全的,二级消力池起到了消能作用;4号深孔洞身时均压力分布均匀,无负压,设计侧墙高度满足运行要求;电站1~4号机进口快速闸门漏水量达到或超过设计允许值,1号机导叶漏水量满足设计值。

关 键 词:水利枢纽 水力学 原型观测

Hydraulic Prototype Observation of the Geheyan Hydropower Project
Liu Kehuang and Ning Tingjun. Hydraulic Prototype Observation of the Geheyan Hydropower Project[J]. Water Power, 1994, 0(1): 24-29
Authors:Liu Kehuang and Ning Tingjun
Affiliation:Yangtze River Hydraulic Research Institute
Abstract:From 1992 to 1993 the hydraulic prototype observation was conducted at the Geheyan hydropower station. Observed parts included the lst and the 2nd stage stilling basins, high and low level outlets, water tunnel and power house. Observation contents included pulsating Characteristics, flow regime, atomization,aeration, and cavitation, etc. The observed results show that the lst stage stilling basin is safe,the 2nd stage stilling basin is in good operation. the No. 4 deep outlet is under uniform pressure and in it no negative pressure occurs. The height of the guide wall meets the requirement, and the leakage through the stop gate is increasing with the rise of the reservoit surface and exceeds the allowable value, but the leakage through the No. 1 turbine guide vane meets the design requirement.
Keywords:the Geheyan hydropower project  hydraulic prototype observation  stilling basin  deep outlet  power station  atomization  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号