大型吊车梁焊接变形的控制
引用本文:刘原. 大型吊车梁焊接变形的控制[J]. 石油工程建设, 2001, 27(2): 12-14
作者姓名:刘原
作者单位:中石化集团第四建设公司金属结构厂
摘    要:介绍重载、大跨度吊车梁的腹板、翼板、筋板之间的焊接顺序和焊接工艺,通过一系列措施控制了吊车梁的焊接变形,保证了吊车梁的最终尺寸要求。

关 键 词:吊装设备 焊接 变形 预防措施
修稿时间:2000-12-08

The Preventive Measure forWelding Deformation in a Large Hoist Beam
Liu Yuan. The Preventive Measure forWelding Deformation in a Large Hoist Beam[J]. Petroleum Engineering Construction, 2001, 27(2): 12-14
Authors:Liu Yuan
Abstract:The welding procedure & welding technology for web plate,limb plate & reinforcing plate on a heavy-duty,large span hoist beam were introduced. The welding deformation of hoist beam was controlled by some preventive measures and the maximum size requirement of hoist beam was guaranteed.
Keywords:hoisting equipment  welding  deformation  preventive measure