首页 | 本学科首页   官方微博 | 高级检索  
     

静压桩隔时压桩试桩的探讨
引用本文:吴巧霞.静压桩隔时压桩试桩的探讨[J].福建建筑,2005(4).
作者姓名:吴巧霞
作者单位:厦门航空有限公司 福建厦门361006
摘    要:本文介绍一种新的静压桩试桩方法———隔时压桩试桩法,即试压桩后间隔2·0h即进行单桩极限承载力测试,然后选择能满足设计要求的压桩力作为工程桩施工时的终压力。用这种试压桩确定的终压力来指导工程桩的施工,既能满足单桩设计承载力要求,又不致产生不必要的浪费。

关 键 词:静压桩  隔时压桩试桩  终压力

The Discussing final pressure of static P.H.C.T.P. (Prestressed High-stren gth Concrete Tubular Piles)
Wu Qiao xia.The Discussing final pressure of static P.H.C.T.P. (Prestressed High-stren gth Concrete Tubular Piles)[J].Fujian Architecture & Construction,2005(4).
Authors:Wu Qiao xia
Abstract:The paper introduces a new static P.H.C.T.P. (Prest re ssed High-strength Concrete Tubular Piles) trail method. The quintessence of this me t hod:① Pushing down a pile with certainty pressure ② interval 2.0hours ③ push i ng down the pile again and measuring utmost pressure at that time. ④confirming final pressure by utmost pressure. The method could save on the construction ma t erial, abridge the engineering period. In the same time, the bearing capacity c o uld satisfy the design requirement.
Keywords:Static P  H  C  T  P  Interval pushing down pile testing  Fina l pressure
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号