首页 | 本学科首页   官方微博 | 高级检索  
     

牛栏沟水电站施工导流设计特点
引用本文:伊军. 牛栏沟水电站施工导流设计特点[J]. 水利水电技术, 2010, 41(1)
作者姓名:伊军
作者单位:中国水电顾问集团北京勘测设计研究院,北京,100024
摘    要:通过对牛栏沟水电站导流程序的合理划分,提出了非汛期利用时段,为实现总工期目标,打下了坚实基础。使用导流手段缓解工期紧张矛盾,是水电工程探索的课题。

关 键 词:施工导流  导流标准  导流明渠  围堰  枯水基坑  牛栏沟水电站

Characteristics of diversion design for construction of Niulangou Hydropower Station
YI Jun. Characteristics of diversion design for construction of Niulangou Hydropower Station[J]. Water Resources and Hydropower Engineering, 2010, 41(1)
Authors:YI Jun
Affiliation:YI Jun(Hydrochina Beijing Engineering Corporation,Beijing 100024,China)
Abstract:The design concept of the construction diversion for the project of Niulangou Hydropower Station is briefly described herein;in which the impacts from the characteristics and difficulties of the diversion on the construction schedule is also expatiated.The available period of the non-flood-season is then presented through the reasonable division of the diversion process,so as to make a better basis for realizing the object of the general construction schedule.On the whole,it is really a subject to be furthe...
Keywords:construction diversion  standard of diversion  open-channel of diversion  construction cofferdam  foundation pit of low water  Niulangou Hydropower Station