Abstract: | Underground engineering, especially large hydropower project of water, power plant, and tail water system arrangement in underground can reduce cover, save the limited land resources. Because of the small destruction of the ground, good environmental protection and small combat readiness safety characteristic,it is widely used in the large engineering. Large-scale power plant system layout in underground has its advantages, but bring construction difficulty is obvious, the one of the difficulties is ventilation of smoke. This paper discussed the ventilation planning of project construction for large underground project taking Liyang Pumped Storage Power Station as an example. |