Settlement monitoring system of pile-group foundation |
| |
Authors: | Zhi-jian Chen Ning-ning Zhang Xiong-wen Zhang |
| |
Affiliation: | [1]School of Earth Science and Engineering, Hohai University, Nanjing 210098, China [2]Jiangsu Transportation Research Institute Co., Ltd., Nanjing 211112, China |
| |
Abstract: | In order to realize information construction on settlement of pile-group foundation of Sutong Bridge, the monitoring instruments of high-precision micro-pressure sensor and hydrostatic leveling and settlement profiler were integrated synthetically. A set of practical multi-scale monitoring system on settlement of super-large pile-group foundation in deep water was put forward. The reliable settlement results are obtained by means of multi-sensor data fusion. Finite element model of pile-group foundation is established. By analysis of finite element simulated calculation of pile-group foundation, rules of settlement and uneven settlement obtained by monitoring and calculation results are coincident and the absolute error of settlement between them is 4.7 mm. The research shows that it is reasonable and feasible to monitor settlement of pile-group foundation with the system, and it can provide a method for the same type pile-group foundation in deep water. |
| |
Keywords: | pile-group foundation settlement monitoring system multi-sensor data fusion |
本文献已被 维普 SpringerLink 等数据库收录! |
|