首页 | 本学科首页   官方微博 | 高级检索  
     

基于BIM+CV的现浇混凝土建筑结构构件定位
作者姓名:薛靖国  侯学良
作者单位:华北电力大学经济与管理学院,北京 102206
摘    要:建筑结构构件定位是自动化进度追踪的关键.现有研究的监控对象均为简单的施工现场,而今建筑的形式越来越复杂且以现浇混凝土结构为主.为了追踪这类建筑的施工进度,基于建筑信息建模(BIM)和计算机视觉(CV)技术,提出了一种从俯视视角对现浇混凝土建筑结构构件定位的方法.首先使用目标检测技术从施工现场俯视图中识别处于施工状态的建...

关 键 词:施工进度追踪  构件定位  建筑信息建模  目标检测  投影模型

Location of cast-in-place concrete structural members based on BIM + CV
Authors:XUE Jing-guo  HOU Xue-liang
Affiliation:School of Economics and Management, North China Electric Power University, Beijing 102206, China
Abstract:The positioning of building structural components is the key to automatic progress tracking. In the existing research results, the monitoring object is a simple construction site, and the form of today’s buildings is increasingly complex and is mainly of cast-in-place concrete structure. In order to track the construction progress of this kind of building, based on building information modeling (BIM) and computer vision (CV) technology, a method was proposed to locate the structural members of cast-in-place concrete building from the top view. Firstly, target detection technology was employed to identify the structural components in the construction state from the top view of the construction site. The BIM elements were projected onto the imaging plane based on the principle of camera imaging. Finally, the mapping relationship between the actual components and BIM elements was established through the results of registration and projection, so as to realize the automatic positioning of structural components. The experimental results show that the recognition accuracy is 82.08% and the registration rate is 94.17%. The recognition and registration effect of the plane formwork is the best. Compared with the similar methods, this method reduces the degree of occlusion, makes full use of the context information, and is more in line with the actual construction process. It provides a new scheme for the construction process tracking of complex buildings. 
Keywords:construction progress tracking  component positioning  building information modeling  target detection    projection model   
本文献已被 万方数据 等数据库收录!
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号