Modernization of Continuous Casters for Casting Rounds at the Volga Pipe Plant |
| |
Authors: | A. G. Lyal'kov V. I. Markovich V. V. Masnyi I. V. Neklyudov V. B. Gankin A. S. Smolyakov A. V. Shapiro I. N. Shifrin |
| |
Affiliation: | 1. Volga Pipe Plant, Russia 2. All-Russia Scientific, Research, Planning, and Design Institute of Metallurgical Machinery (VNIIMETMASh), Russia
|
| |
Abstract: | The modern electric steelmaking equipment and technology in use at the Volga Pipe Plant allows that facility to make tubular semifinished products composed of a wide range of steels. Due to an increase in the volume of production and the number of orders being received for 156-mm-diam. semifinished products, the plant found it necessary to increase the productivity of the continuous caster in the casting of small-diameter products. The plant worked with VNIIMETMASh to modernize its existing continuous section caster. The technical and organizational changes that were made in order to cast 156-mm-diam. semifinished products have elevated the performance of caster No. 2 to world-class level. The modernization effort was completed well in advance of the scheduled date. |
| |
Keywords: | |
本文献已被 SpringerLink 等数据库收录! |