Using the MD CAD model to develop the time–cost integrated schedule for construction projects
Authors:Chung-Wei Feng  Yi-Jao Chen  Jiun-Ru Huang
Affiliation:1. Department of Civil Engineering, National Cheng Kung University, No. 1, Ta-Hsueh Rd., Tainan 70101, Taiwan;2. Department of Asset Science, Leader University, No. 188, Sec. 5, An-Chung Rd., Tainan 70946, Taiwan;3. Taiwan Construction Research Institute, 11F, No. 190, Sec. 2, Chung-Hsing Rd., Hsintien, Taipei 231, Taiwan
Abstract:Time and cost are two critical factors determining the success of a construction project. However, it is still a daunting task for project planners to develop a time–cost integrated schedule due to the tremendous amount of information that need to be processed. Various research efforts have been made to develop model-based systems to facilitate information processing and integrate time and cost throughout the project life cycle. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project management. This paper presents a scheduling system that applies Multi-Dimensional (MD) CAD model, Object Sequencing Matrix (OSM), and genetic algorithms (GAs) to generate the time–cost integrated schedule for the construction project. A computer implementation called MD CAD model-based Project Scheduling System (MD_PSS) is also developed to verify the feasibility of the proposed approach.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号