首页 | 本学科首页   官方微博 | 高级检索  
     

带有竖井的输水隧道地震响应分析
引用本文:刘金云,夏才初,陈健云,郭巍.带有竖井的输水隧道地震响应分析[J].人民长江,2012,43(1):45-47.
作者姓名:刘金云  夏才初  陈健云  郭巍
作者单位:1. 同济大学土木工程学院地下建筑与工程系,上海200092;黑龙江八一农垦大学工程学院,黑龙江大庆163319
2. 同济大学土木工程学院地下建筑与工程系,上海,200092
3. 大连理工大学水利学院,辽宁大连,116085
4. 黑龙江八一农垦大学工程学院,黑龙江大庆,163319
基金项目:国家自然科学基金重点项目,交通运输部西部交通建设科技项目
摘    要:由于受应力集中及外形发生变化的影响,对于带有竖井的输水隧道,其在地震荷载作用下的应力、变形特性与一般输水隧道存在明显不同。采用基于势的流-固耦合运动方程建立了带有竖井的输水隧道有限元模型,考察其对于地震输入的响应。计算结果表明,由于应力集中,在竖井与隧道接头段,主应力最大;对于隧道段与竖井段,其主应力基本相同,但比不带竖井的隧道主应力要大;地震激励方向的位移最大值发生在隧道段。

关 键 词:输水隧道  竖井  流-固耦合  地震响应分析

Seismic response analysis of water conveyance tunnel with shaft
LIU Jinyun , XIA Caichu , CHEN Jianyun , GUO Wei.Seismic response analysis of water conveyance tunnel with shaft[J].Yangtze River,2012,43(1):45-47.
Authors:LIU Jinyun  XIA Caichu  CHEN Jianyun  GUO Wei
Affiliation:1.College of Civil Engineering,Tongji University,Shanghai 200092,China;2.College of Engineering,Heilongjiang Bayi Agricultural University,Daqing 163319,China;3.Faculty of Infrastructure Engineering,Dalian University of Engineering,Dalian 116085,China)
Abstract:As influence of stress concentration and shape change,the stress and deformation features of water conveyance tunnel with shaft under seismic load are distinct with the common water conveyance tunnel.The FEM model of water conveyance tunnel with shaft adopting potential-based fluid-solid coupling equation is established,with consideration of the response of seismic input.The results show that due to stress concentration at joint of shaft and tunnel,the largest principal stress appears;the principal stress at tunnel section is approximately equal to that of shaft section,which is higher than the tunnel without shaft;the largest displacement parallel to seismic excitation direction appears at tunnel section.
Keywords:water conveyance tunnel  shaft  fluid-solid coupling  seismic response analysis
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号