首页 | 本学科首页   官方微博 | 高级检索  
     

大斜度井偏心环空注水泥顶替数值模拟研究
引用本文:李明忠,王成文,王长权,郭胜来,方群.大斜度井偏心环空注水泥顶替数值模拟研究[J].石油钻探技术,2012,40(5):40-44.
作者姓名:李明忠  王成文  王长权  郭胜来  方群
作者单位:1. 中国石油大学(华东)石油工程学院,山东青岛,266580
2. 中国石油大庆钻探工程公司钻井四公司,吉林松原,138000
基金项目:国家自然科学基金项目“水热合成型固井材料体系及其高温固化机理研究”(编号:51174226)资助
摘    要:为了进一步了解大斜度井注水泥顶替机理,提高注水泥顶替效率,借助计算流体力学软件Fluent,建立了大斜度井环空三维模型,采用流体体积法进行了水泥浆顶替钻井液的数值模拟研究。分析了井斜角、偏心度以及水泥浆与钻井液的密度差对顶替效率和顶替界面稳定性的影响规律:增大井斜角会降低注水泥顶替效率;在大斜度井偏心环空中,随着水泥浆与钻井液密度差的增大,顶替效率先增大后降低;在大斜度井中,套管偏心并不完全是降低顶替效率,当套管具有一定偏心(建议偏心度取为0.1~0.2)时,可在一定程度上阻止由于正密度差造成的水泥浆在环空低侧窄间隙突进,从而提高顶替效率。通过数值模拟,总结了大斜度井与直井注水泥顶替机理的区别,为大斜度井注水泥顶替参数设计提供了一定的参考和理论依据。

关 键 词:大斜度井  顶替效率  顶替界面  井斜角  偏心度  密度差

Numerical Simulation of Cement Displacement in Eccentric Annulus at Highly Deviated Wells
Li Mingzhong , Wang Chengwen , Wang Changquan , Guo Shenglai , Fang Qun.Numerical Simulation of Cement Displacement in Eccentric Annulus at Highly Deviated Wells[J].Petroleum Drilling Techniques,2012,40(5):40-44.
Authors:Li Mingzhong  Wang Chengwen  Wang Changquan  Guo Shenglai  Fang Qun
Affiliation:1 (1.School of Petroleum Engineering,China University of Petroleum(Huadong),Qingdao,Shandong,266580,China;2.No.4 Drilling Company,Daqing Drilling & Exploration Engineering Company,CNPC,Songyuan,Jilin,138000,China)
Abstract:In order to understand the displacement mechanism and improve displacement efficiency in highly deviated well,three-dimensional annular model was developed using the CFD software Fluent,and numerical simulation studied with drilling fluid displaced by cement slurry by means of VOF method.The paper studied the influences of deviation angle,casing eccentricity and density difference between cement slurry and drilling mud on displacement efficiency and stability of displacement interface.The simulation results indicated that wellbores with a high deviation angle have lower displacement efficiency;in an eccentric annulus at highly deviated section,the displacement efficiency first increases then decreases with the increase of density difference between cement slurry and drilling fluid;casing eccentricity is not absolutely a factor reducing displacement efficiency in highly deviated well.A certain casing eccentricity(eccentricity 0.1-0.2 proposed) can eliminate fingering caused by the density difference to some extent in narrow annulus at lower side,and improve displacement efficiency.After numerical simulation study on cement displacement,the displacement mechanism differences between highly deviated wells and vertical wells were identified,which provides reference and basis for optimizing displacement parameters in the design of cementing for highly deviated wells.
Keywords:high angle deviated hole  displacement efficiency  displacement interface  deviation angle  eccentricity  density difference
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号