摘    要:硬填料坝(Hardfill坝)是一种新坝型,Oyuk坝是世界上仅有的两座高度超过100 m的硬填料坝之一。对该坝在正常运行工况以及地震工况下的大坝工作性态进行了弹塑性有限元分析,并运用水荷载与地震荷载超载法探讨了Oyuk坝在静动条件下的破坏模式与安全度。研究结果表明,在正常运行工况以及OBE地震工况中,Oyuk坝全断面受压,坝体强度安全系数与抗滑稳定系数均较高,坝体基本处于弹性工作状态。由于该坝在坝底、坝踵设置混凝土分区、并在坝趾区采用了高强度硬填料等措施,在水荷载及地震超载分析中具有很高超载安全度。

关 键 词:硬填料坝  弹塑性有限元  结构安全度  Oyuk坝

Structural safety analysis of a 1OOm level hardfill dam
XIONG Kun , HE Yunlong , CHEN Tao.Structural safety analysis of a 1OOm level hardfill dam[J].Yangtze River,2012,43(2):74-77.
Authors:XIONG Kun  HE Yunlong  CHEN Tao
Affiliation:1.Engineering Development Center,Changjiang Institute of Survey,Planning,Design and Research,Wuhan 430010,China;2.State Key Lab.of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu 610065,China;3.State Key Lab.of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan 430072,China;4.Xinglong Hydropower Station Administrative Department of South-to-north Water Diversion in Hubei,Qianjiang 433100,China)
Abstract:Hardfill dam is a new type of dam,and Oyuk Dam is one of the only two Hardfill dams higher than 100m in the world.Based on elastoplastic FEM,the failure modes and structural safety of the dam under static and seismic conditions were studied with overload method by water load and earthquake load.The results show that whole section of dam body is almost compressed under the condition of normal operation and basis earthquake with high strength and anti-sliding safety factors and is basically in an elastic state.Because of engineering measures such as concrete partition at dam bottom and dam heel,high strength hardfill material filling at dam toe,the dam possesses high overload safety margin for water load and earthquake.
Keywords:hardfill dam  elastoplastic FEM  structural safety  Oyuk Dam