浅谈预应力锚索在泰安抽水蓄能电站的应用
引用本文:简俊杰,丁西武. 浅谈预应力锚索在泰安抽水蓄能电站的应用[J]. 水力发电, 2006, 32(4): 43-45
作者姓名:简俊杰  丁西武
作者单位:武警水电第一总队四支队,广西,南宁,530222;武警水电第一总队四支队,广西,南宁,530222
摘    要:泰安抽水蓄能电站左坝头边坡存在较大安全隐患,设计采用无粘结预应力锚索进行加固处理。预应力锚索施工技术主要包括钢铰线、张拉机具选取,灌浆工艺,张拉工艺,端部封堵等。施工过程中严格质量控制,坚持安全施工,圆满完成任务。

关 键 词:预应力锚索  无粘结端头锚  施工工艺  泰安抽水蓄能电站
文章编号:0559-9342(2006)04-0043-03
收稿时间:2006-03-12
修稿时间:2006-03-12

The Application of the Pre-stressed Anchorage Cable in Tai'an Pumped Storage Hydropower Station
Jian Junjie,Ding Xiwu. The Application of the Pre-stressed Anchorage Cable in Tai'an Pumped Storage Hydropower Station[J]. Water Power, 2006, 32(4): 43-45
Authors:Jian Junjie  Ding Xiwu
Affiliation:The 4th Branch of the 1st Brigade of the Hydropower Troops of the Armed Police, Nanning Guangxi 530222
Abstract:Since big hidden troubles exist in the side-slope of the left-bank of Tai'an Pumped Storage Hydropower Station,pre-stressed anchorage cables without adhesive bond end socket have been adopted for the purpose of reinforcement.The construction technology of the pre-stressed anchorage cable mainly include steel cable,choice of pulling implement,grouting technology,pulling technology,head end plugging,etc.With safety in mind,the quality has been strictly supervised in the process of construction.
Keywords:the pre-stressed anchorage cable  anchorage cable without adhesive bond end socket  construction technology  Tai'an Pumped Storage Hydropower Station