摘    要:基于江苏宜兴抽水蓄能电站上水库主坝坝基抗剪桩施工存在的问题,对在特殊地质条件下大直径抗剪桩施工的主要流程、安全保障措施以及特殊问题处理进行了总结,提出在抗剪桩施工时宜采用"小进尺,强支护,多循环"的方法,为其他同类工程的施工提供了可借鉴的经验.

关 键 词:抗剪桩  坝基稳定  施工技术  抽水蓄能电站

Large-diameter Shear-Resistant Pile Engineering at Yixing Pumped Storage Power Station in Jiangsu
LV Dong-hai,CHEN Zhong-wei. Large-diameter Shear-Resistant Pile Engineering at Yixing Pumped Storage Power Station in Jiangsu[J]. Hongshui River, 2009, 28(1)
Authors:LV Dong-hai  CHEN Zhong-wei
Affiliation:Yixing Construction Bureau of Sinohydro Bureau 12 Co.;Ltd;Yixing 214200
Abstract:In view of problems found in shear-resistant pile engineering at foundation of reservoir main dam of Yixing pumped storage power station in Jiangsu,it discusses main procedures,safety precautions and special problems in large-diameter shear-resistant pile engineering under special geologic conditions.It proposes a way of "small footage,strong support,multi circulation" in shear-resistant pile engineering,which may be referred to by the engineering of other similar projects.
Keywords:shear-resistant pile  dam foundation stability  engineering technique  pumped storage power station  