首页 | 本学科首页   官方微博 | 高级检索  
     


A scheduling problem in glass manufacturing
Authors:David W. He   Andrew Kusiak  A. Artiba
Abstract:In this paper, a production scheduling problem in glass manufacturing is studied. The production facility consists of multiple identical production lines and each production line includes a number of serially arranged machines. The production is characterized by semi-ordered processing times in each product family, and the last machine in each production line is a bottleneck machine. Significant changeover times are required when products of different families are produced on a production line. The scheduling problem was modeled as a parallel no-delay flowshop scheduling problem (PNDFSP). The PNDFSP combines the parallel machine scheduling problem (PMSP) with the no-delay flowshop scheduling problem (NDFSP). While PMSP and NDFSP have received considerable attention in the literature, PNDFSP has not been well studied. A mixed-integer programming formulation is developed and an efficient heuristic algorithm is proposed. The sequential heuristic algorithm considers simultaneously the line changeover time, no-delay effect, and line utilization in assigning product families to the production lines. The computational results are reported.
Keywords:
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号