电厂湿法烟气脱硫工程临时烟囱的设计
引用本文:赵礼金. 电厂湿法烟气脱硫工程临时烟囱的设计[J]. 电力科学与工程, 2010, 26(6): 65-67
作者姓名:赵礼金
作者单位:浙江天地环保工程有限公司设计部,浙江,杭州,310003
摘    要:在燃煤电厂烟气脱硫技改项目中,因不设烟气换热器而需要对原烟囱进行防腐改造:为了解决因施工影响主机运行的难题,需要设置临时烟囱;通过渭河电厂技改工程,介绍了临时烟囱的设计方法,该方法可为类似工程提供参考.

关 键 词:湿法烟气脱硫  技改工程  烟气换热器  烟囱防腐  临时烟囱

Design of Temporary Stack for Retrofitting Project of Plant Wet FGD
Zhao Lijin. Design of Temporary Stack for Retrofitting Project of Plant Wet FGD[J]. Power Science and Engineering, 2010, 26(6): 65-67
Authors:Zhao Lijin
Affiliation:Zhao Lijin(Design Department,Zhejiang Ti,i Environmental Protection Engineering Co.,Ltd.,Hangzhou 310003,China)
Abstract:In retrofitting project of wet FGD for coal-fired power plants,the original stack need to be upgraded for corrosion resistance due to that the GGH will be eliminated.In order to avoid its influence to the main units,it is necessary to construct a temporary stack.In this paper the design of temporary stack about Weihe power plant is introduced,the methods can be used for similar project.
Keywords:wet flue-gas desulphurization  technical reformation project  gas-gas heater(GGH)  stack anticorrosion  temporary stack  