首页 | 本学科首页   官方微博 | 高级检索  
     

十二五期间云南向南方电网送电曲线研究
引用本文:陈谦,刘世宇,曹发文,章超.十二五期间云南向南方电网送电曲线研究[J].南方电网技术,2011,5(6):51-54.
作者姓名:陈谦  刘世宇  曹发文  章超
作者单位:西南电力设计院,成都610021;中国电力工程顾问集团公司,北京100120;广东电力设计研究院;广州510663;中南电力设计院,武汉430071
摘    要:根据"十二五"期间云南西电东送容量规划,综合考虑送端外送电能力、受端电网承受能力、输电通道经济性以及电网安全性等,研究了"十二五"期间云南给南方电网送电曲线。结果显示,云南向广东的送电规模最大达到18.50 GW,送电量5年累计为286.6 TWh;云南向广西的送电规模最大达到3 GW,送电量3年累计为31.7 TWh;云南向广东送电曲线、向广西送电曲线的输电小时合理范围分别为3 800~5 000 h和3 600~4 800 h。

关 键 词:云南电力  水力发电  送电曲线  西电东送  送电规模  电力系统规划

On the Electric Power Transmission Curve from Yunnan to China Southern Power Grid During the "12th Five-Year" Period
CHEN Qian,LIU Shiyu,CAO Fawen and ZHANG Chao.On the Electric Power Transmission Curve from Yunnan to China Southern Power Grid During the "12th Five-Year" Period[J].Southern Power System Technology,2011,5(6):51-54.
Authors:CHEN Qian  LIU Shiyu  CAO Fawen and ZHANG Chao
Affiliation:Southwest Electric Power Design Institute, Chengdu 610021, China;China Power Engineering Consulting Group Corporation, Beijing, China;Guangdong Electric Power Design Institute, Guangzhou 510663, China;Cental Southern China Electric Power Design Institute, Wuhan 430071, China
Abstract:On the basis of electric power transmission capacity planning form west to east during the "12th Five-Year" period,the power transmission curve form Yunnan to CSG is studied and proposed with considering generating capacity of sending power grid,receptivity of received power grid,economical efficiency of transmission equipments and security of power system.Results showed that the maximum scale of power transmission from Yunnan to Guangdong would reach 18.50 GW;electricity would accumulate 286.6 TWh in five years;reasonable transmission equipment availability hour would be between 3 800 h and 5 000 h.Results also showed that from Yunnan to Guangxi,the maximum scale of power transmission would reach 3 GW;electricity would accumulate 31.7 TWh in three years;reasonable transmission equipment availability hour would be between 3 600 h and 4 800 h.
Keywords:Yunnan power  hydroelectric power  electric power transmission curve  West-East electricity transmission project  scale of power flow  power system planning
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《南方电网技术》浏览原始摘要信息
点击此处可从《南方电网技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏