三峡电站投产后兴建抽水蓄能电站的必要性
引用本文:陶仲兵 吴耀武. 三峡电站投产后兴建抽水蓄能电站的必要性[J]. 水电能源科学, 1996, 14(3): 208-212
作者姓名:陶仲兵 吴耀武
作者单位:华中理工大学
摘    要:论述了2010年三峡电站投产可承担系统的部分调峰任务,使火电机组的调峰性能提高,但在系统调峰容量明显扩大的情况下,华中电网建设抽水蓄能电站是必要的.

关 键 词:电力系统,抽水蓄能,调峰容量

THE INQUIRY OF THE NECESSITY TO CONSTRUCT PUMPING-STORAGE STATIONS FOR THE SANXIA STATION
Tao Zhongbing,Wu Yaowu,Liang Niansheng,Wang Jialin. THE INQUIRY OF THE NECESSITY TO CONSTRUCT PUMPING-STORAGE STATIONS FOR THE SANXIA STATION[J]. International Journal Hydroelectric Energy, 1996, 14(3): 208-212
Authors:Tao Zhongbing  Wu Yaowu  Liang Niansheng  Wang Jialin
Abstract:In 2010,the Sanxis Saution,that will have been constructed, could undertake the part of the peak load of Central China Power System,and the abililty of which thermal units take on the peak load is greater than that at Ptesent,but the demand of the capacity,that could be used to take on the peak load, will obviously enlarge.This Paper analyzes the necessity that the pumping-storage stations will be construted in Central China Power System in 2010 under these circumstances.
Keywords:power systems  Pumping-storage  the capacity  peak load