首页 | 本学科首页   官方微博 | 高级检索  
     

龙塘沿铁矿勘查工程间距验证与探讨
引用本文:张文娟.龙塘沿铁矿勘查工程间距验证与探讨[J].现代矿业,2020,36(11):17-21.
作者姓名:张文娟
作者单位:五矿矿业控股有限公司
摘    要:龙塘沿铁矿详查采用100 m×100 m的网度探求控制的资源储量,通过近2 a的生产勘探及开拓、采切、回采工程,发现原有勘查工程间距已不能满足矿山开拓和采准工程的布设要求,导致工程及矿量的浪费。为此,通过与详查阶段的对比验证,采用加密法对龙塘沿Fe25矿体的勘探工程间距进行对比,结合规范确定合理的工程勘查间距,采用50 m×50 m的网度探求控制的资源储量。

关 键 词:铁矿  Fe25矿体  勘查工程间距  对比验证  加密法  

Verification and Discussion on the Spacing of Longtangyan Iron Mine Exploration Project
ZHANG Wenjuan.Verification and Discussion on the Spacing of Longtangyan Iron Mine Exploration Project[J].Modern Mining,2020,36(11):17-21.
Authors:ZHANG Wenjuan
Affiliation:Minmetals Mining Holdings Limited
Abstract:The detailed investigation of Longtangyan Iron Mine uses a 100 m×100 m net to explore and control the resource reserves.In the past two years,it has been discovered that the original exploration project spacing can no longer meet the requirements of mine development and mining projects through production exploration and development,mining and cutting,and mining projects.The layout requirements result in waste of engineering and mine volume.Through the comparison and verification with the detailed investigation stage,the density method is used to compare the exploration project spacing of the Longtangyan Fe25 ore body,and another reasonable project investigation spacing is determined in combination with the specifications to explore the resource reserves controlled by a network of 50 m×50 m.
Keywords:iron mine  Fe25 ore body  survey engineering interval  comparison and verification  encryption method    
点击此处可从《现代矿业》浏览原始摘要信息
点击此处可从《现代矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号