首页 | 本学科首页   官方微博 | 高级检索  
     

国产引进型300MW机组顺序阀运行研究
引用本文:吕继奎.国产引进型300MW机组顺序阀运行研究[J].中国电力,2003,36(4):21-24.
作者姓名:吕继奎
作者单位:华中科技大学,湖北,武汉,511457
摘    要:针对部分机组单阀切顺序阀运行时引起的负荷波动、顺序阀运行后轴向位移发生异常变化问题,对国产引进型300MW机组的顺序阀运行方式进行探讨,对单阀切顺序阀引起的负荷波动、轴向位移变化原因及解决方法进行试验研究,并通过热力试验比较单阀、顺序阀运行时的经济性。

关 键 词:国产引进型300MW机组  顺序阀  运行  汽轮发电机组  热力试验
文章编号:1004-9649(2003)04-0021-04
修稿时间:2002年10月26

Study of sequential valve operation of homemade imported type 300 MW unit
LU Ji,-,kui.Study of sequential valve operation of homemade imported type 300 MW unit[J].Electric Power,2003,36(4):21-24.
Authors:LU Ji  -  kui
Abstract:On part homemade imported type300MW steam turbines,load fluctuation occurred during switching from single valve to sequential valve operation,and abnormal variation of axial displacement occurred after sequential valve was put into operation.In view of these problems,this paper studied the operation mode of sequential valve of homemade imported type300MWsteam turbine.The causes of load fluctuation and axial displacement variation during switching from single valve to sequential valve and the solving method were tested and studied,and the economics of single valve and sequential valve operation was compared through thermodynamic tests.
Keywords:MWsteam turbine  sequential valve operation  axial displacement  economics comparison
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号