首页 | 本学科首页   官方微博 | 高级检索  
     

长江三峡工程永久船闸中隔墩岩体变形分析及预测
引用本文:黄志全,廖德华,张长存,姜彤,张镜剑. 长江三峡工程永久船闸中隔墩岩体变形分析及预测[J]. 岩石力学与工程学报, 2002, 21(8): 1162-1167
作者姓名:黄志全  廖德华  张长存  姜彤  张镜剑
作者单位:1. 华北水利水电学院岩土工程系,郑州,450045;石油大学地球科学系,北京,102200
2. 广西水电科学研究所,南宁,530021
3. 天津勘测设计研究院,天津,300222
4. 华北水利水电学院岩土工程系,郑州,450045
基金项目:中国长江三峡工程开发总公司资助项目。
摘    要:采用综合方法对长江三峡工程永久船闸二闸室至三闸首部分的中隔墩岩体变形规律进行了分析及预测。首先,运用离散单元法与有限单元法等数值模拟方法分析了该段中隔墩岩体分别在施工期和运行期的变形规律。然后,在监测数据的基础上,采用时间序列和灰色系统方法预测了岩体的变形趋势。综合分析结果表明:垂直于闸室轴线的水平位移在开挖完成后基本处于稳定状态,而在运行期有所减少;平行于闸室轴线的水平位移总体向下游发展;而垂直方向的位移先表现为回弹,后发生沉降。

关 键 词:三峡工程  中隔墩  变形  预测
文章编号:1000-6915(2002)08-1162-06
修稿时间:2001-03-14

ANALYSIS AND FORECAST ON ROCK DEFORMATION OF MIDDLE-ISOLATED PIER OF PERMANENT SHIPLOCK IN THE THREE GORGES PROJECT ON YANGTZE RIVER
Huang Zhiquan,,Liao Dehua,Zhang Changcun,Jiang Tong,Zhang Jingjian. ANALYSIS AND FORECAST ON ROCK DEFORMATION OF MIDDLE-ISOLATED PIER OF PERMANENT SHIPLOCK IN THE THREE GORGES PROJECT ON YANGTZE RIVER[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(8): 1162-1167
Authors:Huang Zhiquan    Liao Dehua  Zhang Changcun  Jiang Tong  Zhang Jingjian
Affiliation:Huang Zhiquan1,4,Liao Dehua2,Zhang Changcun3,Jiang Tong1,Zhang Jingjian1
Abstract:The middle-isolated pier is one of the key structures of permanent shiplock of the Three Gorges Project on Yangtze River,China. The rockmass deformation of middle-isolated pier of the second shiplock under various operation conditions is studied. The numerical simulations using 2-D distinct element method and 3-D finite element method are applied to analyze rockmass deformation law. Simultaneously,the time series analysis and grey system theory are used to predict the tendency of rock displacements based on in-situ measured data. The comprehensive results can be summarized as follows. (1) The horizontal displacement perpendicular to axial line of shiplock varies with process of excavation,and is in steady state after excavation. During operation of shiplock,the displacement is slightly decreased. (2) The horizontal displacement parallel to axial line of shiplock is of tendency of developing to downstream. (3) The vertical displacement occurred as resilient deformation during excavation,and then subsidence with slightly various values takes place in different part of the middle-isolated pier under different operation cases.
Keywords:the Three Gorges Project (TGP)  middle-isolated pier  deformation  forecast
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号