首页 | 本学科首页   官方微博 | 高级检索  
     

新奥法在特大断面地下硐室施工中的应用
引用本文:方浩. 新奥法在特大断面地下硐室施工中的应用[J]. 山西建筑, 2011, 37(3): 64-65
作者姓名:方浩
作者单位:中国水利水电第十二工程局有限公司第一分局,浙江,杭州,310018
摘    要:针对黑麋峰电站主厂房的地质特点和特长特大硐室开挖的实际情况,根据"新奥法"设计思想,确定了主要施工措施、方案及支护工艺。在实际应用阶段进行了现场监测,结果表明,合理运用"新奥法"原理,能有效地保证地下硐室围岩的稳定。

关 键 词:地下厂房  开挖支护施工  新奥法

On application of new Austrain method in super-large section underground combined chamber construction
FANG Hao. On application of new Austrain method in super-large section underground combined chamber construction[J]. Shanxi Architecture, 2011, 37(3): 64-65
Authors:FANG Hao
Abstract:According to the facts of the geological characteristics of Heimifeng station's main workshop and the super-large and super-long combined chamber excavation,the paper according to the new Austrain method design thought,identifies the main construction measures,the schemes and the support craft,undertakes the field supervision at the application stage,and proves the reasonable application of new Austrain method principle can effectively ensure the stability of the surrounding rocks of underground combined ch...
Keywords:underground workshop  excavation support construction  new Austrain method  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号