首页 | 本学科首页   官方微博 | 高级检索  
     


Field and Lab Investigations of Prematurely Cracking Pavements
Authors:Dar Hao Chen
Affiliation:Professor, School of Highway Engineering, Changsha Univ. of Science & Technology, Chiling Road 45#, Changsha, Hunan, P.R. China, 410076 and Pavement Engineering Supervisor, Texas Dept. of Transportation, 4203 Bull Creek #39, Austin, TX 78731 (corresponding author). E-mail: dchen@dot.state.tx.us
Abstract:A forensic study was conducted to identify the cause of the premature cracking on three recently completed projects that were built with the same design. Nondestructive ground penetration radar, falling weight deflectometer (FWD), GeoGauge, and Portable FWD], nuclear density gauge, dynamic cone penetration, and extensive laboratory tests were performed. It was found that the initial stiffness of the treated base was found to be excessively high by FWD backcalculation. Some sections of the backcalculated base moduli were over 20.7?GPa. This indicates that the layer is excessively brittle for a base material, similar to lean concrete. Six specimens (that were made without a mellowing period) exhibited cracks. There was no cracking for six specimens that had two days of mellowing. It was concluded that the culprit of the transverse cracking in the main lanes was the shrinkage of lime treated base layers. The longitudinal cracks are related to the edge drying and the transverse cracks are related to the insufficient mellowing period. Based on the findings of this study, the District implemented a 2-day mellowing period for Quicklime treated caliche base. Three newly constructed pavements (age 8, 5, and 2?months) were surveyed. No cracking can be observed so far, and the District thinks the cracking problem has been mitigated by the 2-day mellowing period. Without the mellowing period, cracking had normally occurred 1?to?2?months after construction..
Keywords:Pavements  Cracking  Forensic engineering  Nondestructive tests  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号