首页 | 本学科首页   官方微博 | 高级检索  
     


A framework for an automated and integrated project scheduling and management system
Affiliation:1. Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, NY 10027, USA;2. Center for Construction Management Technology, Department of Civil Engineering (Construction), Polytechnic University, Brooklyn, NY 11201, USA;3. Department of Civil Engineering, National Taiwan University, Taiwan;1. Tamkang University, No. 151, Ying-Chuan Road, Tamsui, Taipei County, Taiwan;2. Senior Lecturer, School of Built Environment, Curtin University, Australia;3. Master, Department of Civil Engineering, Tamkang University, Taiwan;1. Department of Civil Engineering, National Chiao Tung University, 1001, University Road, Hsin-Chu, Taiwan;2. Graduate Institute of Construction Engineering and Management, National Central University, No. 300, Jhongda Road, Jhongli City, Taoyuan County 320, Taiwan
Abstract:Construction projects are becoming progressively larger and more complex in terms of physical size and cost. Building information modeling (BIM) is being regarded as a revolutionary change for managing the entire lifecycle of a construction project. However, the information provided by BIM cannot fulfill the requirements of on-site project scheduling and management. This paper presents a BIM-based framework with the function of developing the near-optimum schedule plan according to project objectives and project constraints for project scheduling and management. An automated database management system, a schedule simulation system, and a MD (multi-dimensional) CAD model creator provide a reliable platform for the proposed framework. To verify the concept and test the feasibility of this framework, a computer implementation called NDSM (N-Dimensional project Scheduling and Management system) was developed and implemented in a construction project.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号